complete machining in one fixture position with 1 FM 3+X
1 work piece
forged aluminum
complete machining in one fixture position with 2 FM 3+X
2 work pieces simultaneously
chilled aluminum casting
complete machining in one fixture position with 2 FM 3+X
2 work pieces simultaneously
die cast aluminum
complete machining in one fixture position with 1 FM 3+X
1 work piece
Development
The Problem
The ratio of productive time th (machining) to non-productive time tn (tool change) has become unfavorable due to dramatic developments in tooling technology.